Client: ICP

Location: Wigan

Client: ICP

Electrical Infrastructure Design for a 50MW Battery Energy Storage System (BESS) scheme

DACI undertook the design of the electrical infrastructure for a 50MW Battery Energy Storage System (BESS) scheme. This encompassed the development of the adoptable 33kV network and associated substation, as well as the comprehensive design of the private 33kV, 11kV, LV AC, and LV DC networks within the project site. The design deliverables also incorporated essential power system studies to enable seamless grid connection, along with civil design considerations for the site.